ANALISIS KONSUMSI ENERGI LISTRIK PADA PEMBANGUNAN NUWSP BIYONGA KABUPATEN GORONTALO

Authors

  • Rahmad Hidayat Boli Universitas Gorontalo
  • Rifaldo Pido Universitas Gorontalo
  • Mohamad Rifal Arbie Universitas Gorontalo
  • Wawan Rauf Universitas Gorontalo

DOI:

https://doi.org/10.21776/jrm.v15i1.1496

Keywords:

NUWSP Biyonga, Gorontalo Regency, Electrical Energy, Power, Renewable Energy

Abstract

The need for electrical energy today is starting to increase along with the increase in population and rapid development, but inversely proportional to the progress or innovations in increasing renewable energy. Given that this renewable energy can be developed continuously and operational costs are relatively cheap, the electricity that relies on coal (fossil) over time will run out and cannot be renewed, the discussion concerns the supply of PLN supplies. So that in this study the focus is on the utilization of electrical energy for the NUWSP development area of Gorontalo Regency Biyonga Village and calculating the total consumption needs of the electrical energy used. After research and data analysis, the results obtained are 189 kVA or 189,000 vA, the total peak demand with load is 3 units of centrifugal pumps, 10 points of room lighting, and 12 points of lighting around the building, the results of the analysis obtained became a reference and suggested to install electrical energy with a capacity of 197 kVA or 197,000 vA with the consideration that when development occurs, the demand for electrical energy is still sufficient from what is installed.

Author Biographies

Rifaldo Pido, Universitas Gorontalo

Dosen Teknik Mesin

Mohamad Rifal Arbie, Universitas Gorontalo

Dosen Teknik Mesin

Wawan Rauf, Universitas Gorontalo

Dosen Teknik Mesin

References

D. Ebtke, “Performance DG of Ebtke Year 2020 Directorate General of New, Renewable Energy and Energy Conservation Ministry of Energy and Mineral Resources,” 2020.

R. T. Sataloff, M. M. Johns, and K. M. Kost, “ESDM No 05 Tahun 2017,” 2017, p. 36.

L. Garci Reyes, “Analisis kebutuhan listrik dan penambahan pembangkit listrik,” J. Chem. Inf. Model., vol. 53, no. 9, pp. 1689–1699, 2019.

R. Pido, “Analisa Pengaruh Kenaikan Temperatur Permukaan Solar Cell Terhadap Daya Output,” Gorontalo J. Infrastruct. Sci. Eng., vol. 2, no. 2, p. 24, 2019, doi: 10.32662/gojise.v2i2.683.

T. Costa Belo, D. Notosudjono, and D. Suherdi, “Analisa Kebutuhan Daya Listrik Di Gedung Perkuliahan 10 Lantai Universitas Pakuan Bogor,” Tek. Elektro, vol. 10, no. 1, pp. 1–9, 2015.

H. Hadiyanto and S. Suheidi, “Evaluasi Intensitas Konsumsi Energi Listrik Di Kampus Politeknik Negeri Balikpapan,” JST (Jurnal Sains Ter., vol. 6, no. 1, pp. 1–7, 2020, doi: 10.32487/jst.v6i1.832.

R. H. Boli, R. Pido, and M. Rival, “Analisa Prestasi Kincir Air Tipe Undershot Yang Bekerja Pada Saluran Horizontal,” Koloni, vol. 1, no. 1, pp. 333–340, 2022, [Online]. Available: https://koloni.or.id/index.php/koloni/article/view/4%0Ahttps://koloni.or.id/index.php/koloni/article/download/4/28.

D. S. Rahadi, P. Studi, T. Elektro, F. Teknik, and U. M. Surakarta, “Perancangan kebutuhan energi listrik proyek pembangunan gedung gramedia cilegon,” 2022.

A. S. F. Rajagukguk, M. Pakiding, and M. Rumbayan, “Kajian Perencanaan Kebutuhan dan Pemenuhan Energi Listrik di Kota Manado,” J. Tek. Elektro dan Komput., vol. 4, no. 3, pp. 1–11, 2015, [Online]. Available: https://ejournal.unsrat.ac.id/index.php/elekdankom/article/view/7972.

M. Penelitian, S. Tinggi, and T. Nasional, “Di Kampus STTNAS Yogyakarta Iyus Rusmana Jurusan Teknik Elektro , STTNAS Yogyakarta Jalan Babarsari Caturtunggal , Depok , Sleman email : [email protected],” pp. 70–73, 2013.

K. E. Panas, K. Pemanas, A. I. R. Surya, P. Mobile, and M. Biodiesel, “V13 n3,” no. October, pp. 795–804, 2022.

A. S. Dan, P. I. Pompa, S. Dengan, M. Computational, F. Dynamic, and E. Method, “Fluid Dynamic and FinitE,” no. February, pp. 773–786, 2022.

A. Wahid, Junaidi, and M. Arsyad, “Analisis Kapasitas Dan Kebutuhan Daya Listrik Untuk Menghemat Penggunaan Energi Listrik Di Fakultas Teknik Universitas Tanjungpura,” J. Tek. Elektro UNTAN, vol. 2, no. 1, p. 10, 2014.

E. Zondra, Atmam, and H. Yuvendius, “Analisis Efisiensi Penggunaan Energi Listrik Di Gedung Madrasah Ibtidaiyah Muhammadiyah I Pekanbaru,” SainETIn, vol. 3, no. 2, pp. 50–58, 2019, doi: 10.31849/sainetin.v3i2.3044.

Y. Daud, F. E. P. Surusa, and S. Humena, “Analisis Intensitas Cahaya pada Gedung Central Medical Unit di Rumah Sakit Umum Daerah Prof.DR.H. Aloe Saboe Kota Gorontalo,” Jambura J. Electr. Electron. Eng., vol. 2, no. 1, pp. 19–23, 2020, doi: 10.37905/jjeee.v2i1.4402.

R. C. Andriyan and W. Winarso, “Perancangan Kebutuhan Daya dan Instalasi Listrik Pada Gedung Askrindo Bogor,” J. Ris. Rekayasa Elektro, vol. 3, no. 1, 2021, doi: 10.30595/jrre.v3i1.9671.

Standar Nasional Indonesia, “Persyaratan Umum Instalasi Listrik 2011 (PUIL 2011),” DirJen Ketenagalistrikan, vol. 2011, no. PUIL, pp. 1–133, 2011.

PUIL, “Persyaratan Umum Instalasi Listrik 2000 (PUIL 2000),” DirJen Ketenagalistrikan, vol. 2000, no. Puil, p. 562, 2000.

R. Gobel, S. Humena, F. Eka, P. Surusa, A. Razak, and F. Karinda, “Perancangan Sistem Elektrikal Gedung Asrama Terpadu Man 1 Kota Gorontalo,” vol. 11, no. November, pp. 60–66, 2022.

H. R. Iskandar, E. Taryana, and S. Syaidina, “Perancangan Kebutuhan Energi Listrik Pembangkit Listrik Tenaga Surya Di Hanggar Delivery Center Pt. Dirgantara Indonesia,” Proseding Semin. Nas. Sains dan Teknol. Fak. Tek. Univ. Muhammadiyah Jakarta, vol. 018, no. Fakultas Teknik Universitas Muhammadiyah jakarta, pp. 1–11, 2018.

D. Nirwana, A. F. Kuraisy, M. Y. Naim, and A. Jaya, “Analisis Rugi-Rugi Daya Pada Jaringan Distribusi Penyulang Jentak Di Ulp Jeneponto PT PLN ( Persero ) Sulselrabar,” vol. 3, no. 1, pp. 19–24, 2020.

Downloads

Published

2024-05-15

How to Cite

Boli, R. H., Pido, R., Arbie, M. R., & Rauf, W. (2024). ANALISIS KONSUMSI ENERGI LISTRIK PADA PEMBANGUNAN NUWSP BIYONGA KABUPATEN GORONTALO. Jurnal Rekayasa Mesin, 15(1), 273–281. https://doi.org/10.21776/jrm.v15i1.1496

Issue

Section

Articles